Organizing drawings within a project
Organizing drawings within a project - Exercise
- To structure your projects, create folders and subfolders within the Project Manager. You can create an unlimited number of folders listed to multiple levels.
- For this demo, create two folders: Panel and Schematic. Within the Schematic folder, create two subfolders: Feeder and Control.
- To move multiple drawings at once, hold the Control or Shift key to select several drawings and drag them into the saved folders.
- To change the order of the drawing in the project, you have two options:
- Drag and drop the drawings within the Project Manager. If you would like to place them inside a folder to a specific spot, expand the folder first. Otherwise, they will be added to the end.
- Right-click on the project name and select Sort.
- Choose the folder placement and sorting preferences within the subfolders. It is also possible for you to sort only the specific subfolder.
- If needed, select the drawings by folder when running the project-wide functions like title block updates, drawing list reports, and publishing, which allows you to run a targeted batch operation with ease.