You have finished this lesson! Here are the major takeaways:
- We went over key concepts of Flow Generative Scheduling that you’ll encounter using the technology.
- We discussed how to identify usage requirements, as each task that will be scheduled in the software will require a pipeline step, duration, and dependency.
- We went over how to gain access through Flow Production Tracking, which you must gain before working with Flow Generative Scheduling.
- We explained that you will need to set up the connection between Flow Generative Scheduling and your Flow Production Tracking site.
- We went over key terminology, as there are important differences in the terminology used within Flow Generative Scheduling, compared to Flow Production Tracking.
Provide your feedback: How helpful was the content you just completed?