& Construction
Integrated BIM tools, including Revit, AutoCAD, and Civil 3D
& Manufacturing
Professional CAD/CAM tools built on Inventor and AutoCAD
DISCLAIMER
This guide may be used for reference purposes only. The contents of this guide are protected by copyright and other forms of proprietary rights owned by, licensed to or controlled by BCA and shall not be reproduced, republished, uploaded, posted, transmitted or otherwise distributed in any way, without the prior written permission of BCA. Modification of any of the contents or use of the contents for any other purpose will be a violation of BCA’s copyright and other intellectual property rights. Any reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise does not constitute or imply BCA’s endorsement or recommendation. BCA or any agency stated in this guide shall not be liable for any reliance on or misinterpretation of any information contained in this guide by any party.
All content used herein is for non-profit educational purposes. Where possible, all credit has been given to the respective owners or creators of the content.
1. INTRODUCTION
The construction industry has been moving towards the adoption of Design for Manufacturing and Assembly (DfMA) where most of the work is done off-site in a controlled manufacturing environment, and are then transported and assembled on site. With more prefabrication, manpower and time needed to construct buildings are reduced, worksites are safer and more conducive, and there is less impact on the surrounding environment.
Prefabricated Mechanical Electrical and Plumbing (MEP) modules is one of the game-changing technologies that can significantly improve productivity. It adopts the DfMA concept where components in MEP services and equipment are integrated into a sub-assembly off-site, for easy installation on site.
This guidebook helps developers, consultants, builders, subcontractors and MEP prefabricators have a better understanding on prefabricated MEP modules, its benefits and good industry practices on such systems.
42 pgs (30 min)
Rick-click on Continue reading above and
select Open link in new window
Source: Building Construction Authority of Singapore