The success of your project relies on decisions you make during its early stages. Using Revit design data during the preconstruction phase helps minimize constructability risks.
Reuse design intent models to make planning and preconstruction decisions earlier. Align your construction modeling efforts for downstream uses.
Connect design to detailing
Model steel connections with a higher level of detail. Use tools to better connect structural design to detailing, helping reduce time to fabrication.
Prepare for fabrication
Use integrated content from fabrication products to convey intent beyond the design phase. Create models ready for fabrication and building systems installation.
Better communication
Use Revit models to coordinate information to improve office-to-field efficiency, quality assurance, and quality control. Increase construction site layout productivity.
See how contractors are using Revit
THE LEGENDRE GROUP
BIM enables collaboration and increased efficiency
The French construction company used Revit models for a more collaborative workflow in the design and construction of the Rennes Metro's B line.
BIM helps reduce material waste and speed construction
During the children’s medical center expansion, the firm used Revit and Navisworks Manage to collaborate with the team, speed the project, and reduce waste.