Running Checklists

00:01

DEEPAK MAINI: For any construction project management

00:03

software to be effective, it needs

00:05

to have a robust checklist management system that

00:08

should allow users on site to run

00:11

various types of checklists, such as commissioning,

00:14

precommissioning, QA QC, safety, and so on.

00:18

This is where BIM 360 Build is absolutely amazing because it

00:22

gives you the flexibility of creating your own custom

00:25

checklists, or you can import checklists from other sources.

00:30

Welcome to running checklist on site using

00:32

the BIM 360 mobile app course.

00:34

In this course, we are going to talk

00:36

about the entire process of running checklists

00:38

on site using the mobile app.

00:41

Now before I jump on to my BIM 360 mobile app,

00:44

I want to show some admin options.

00:46

And for that I'll jump on to my Chrome browser window.

00:50

As discussed in the introduction,

00:52

checklist management system is part of the Field Management

00:55

service.

00:56

So you need to activate the field management

00:58

service for you to be able to run checklists.

01:01

Once the service is activated, if I click on Field Management,

01:05

I can now quickly have a look at all the different roles

01:08

and the permissions assigned to those roles

01:09

when it comes to checklists templates and also checklists.

01:13

Also, for checklists to be effective,

01:16

it is really important that we have got locations

01:19

defined in the project.

01:20

So for example, if I am assigning a commissioning

01:23

checklist to someone, they need to know exactly the location

01:26

of the equipment on which they can run the checklist.

01:29

For that if I click on locations, on this project

01:33

I've got two towers, so tower one and tower two.

01:36

Both these have got roof HVAC locations

01:39

because that's where our equipment are on which we are

01:42

supposed to run the checklists.

01:44

Now that we understand this, let's

01:46

have a quick look at the Field Management service.

01:50

Right now, I'm in the checklists tab

01:52

and I can see that this user has got

01:54

a number of different checklists assigned.

01:56

If I go to the Templates tab, I can

01:58

see that these are the templates that we've got available.

02:01

There's a quality checklist, there's a safety checklist,

02:04

and there's also a commissioning checklist.

02:06

Because this user is logged in as an admin,

02:09

they can import checklists templates

02:11

or they can create new templates as well.

02:14

Going back to the checklist tab, I'm

02:17

going to go into this checklist here

02:19

and I'm going to schedule it to be run today.

02:22

And I'll pick today's date.

02:26

Now that we understand this, let's jump on to the BIM 360

02:29

mobile app and go through the process of running checklists

02:32

on site.

02:34

All right.

02:34

So on the BIM 360 mobile app, I'm

02:36

going to tap on Checklists on the bottom toolbar.

02:40

And I can now see that these are the two checklists that

02:42

were assigned to me that are supposed to be run today.

02:45

I can also see the location of the equipment on which I

02:47

need to run this checklist.

02:49

Because I'm currently in tower one,

02:52

so I'll start with the tower one checklist which

02:54

is the pre functional test.

02:56

I'll tap on the checklist.

02:58

Now this checklist has got two sections.

03:01

The first section is the pre functional test cooling

03:04

tower operation section, and the second section

03:07

is the signature section.

03:09

Let's start with running this checklist.

03:12

The first question is cooling tower starts and runs.

03:16

Once I have gone through the process of starting and running

03:18

the cooling tower, I can then decide whether it

03:21

passes this question or fails.

03:23

In this case, I'm going to go pass.

03:25

And if need be, I can tap on Photograph

03:27

and take a photo as well.

03:30

Second is fan rotation verified correct under normal operation.

03:34

I'll go pass.

03:36

Similarly in this case, I'm going

03:38

to run through all these items.

03:40

I'll make sure that I have performed those activities

03:42

on the equipment and I can then decide whether pass or fail.

03:47

In this case, this equipment passes pre functioning test.

03:51

In the comments I can either comment here.

03:53

And now in the signature section I can specify my name,

03:58

I can specify my company.

04:01

Now notice that as soon as I tap here to sign,

04:04

it says checklists sections are incomplete.

04:07

So what I need to do is I need to make sure I tap on Done

04:11

here once I've run through all the questions in this section.

04:14

And now it says all sections completed

04:16

I can sign this checklist.

04:18

I'll tap here.

04:20

And now I'll tap on Create.

04:22

It shows me on the top right that the checklist

04:24

is completed.

04:25

I can tap on it.

04:27

And now it has completed this checklist.

04:29

I can also see in the checklist panel

04:31

that it says 100% completed.

04:33

Similarly once I'm in tower two, I

04:36

can go to the second checklist.

04:38

In this case section one has got four questions.

04:42

I'm going to pass all of these.

04:46

I'll tap Done.

04:49

And now I can specify the details here as well.

04:54

And lastly, I can tap here to sign.

04:58

Now because this checklist is completed again,

05:00

I can tap on checklist completed.

05:03

And the status of this checklist in the checklist panel

05:06

is also set to completed.

05:08

So this is how we run checklists on site.

05:11

In the next course I'm going to talk

05:13

about what happens if there are nonconforming items that fail.

05:17

How we create issues using those items.

05:19

So I'll see you in the next course.

05:20

Cheers.

Video transcript

00:01

DEEPAK MAINI: For any construction project management

00:03

software to be effective, it needs

00:05

to have a robust checklist management system that

00:08

should allow users on site to run

00:11

various types of checklists, such as commissioning,

00:14

precommissioning, QA QC, safety, and so on.

00:18

This is where BIM 360 Build is absolutely amazing because it

00:22

gives you the flexibility of creating your own custom

00:25

checklists, or you can import checklists from other sources.

00:30

Welcome to running checklist on site using

00:32

the BIM 360 mobile app course.

00:34

In this course, we are going to talk

00:36

about the entire process of running checklists

00:38

on site using the mobile app.

00:41

Now before I jump on to my BIM 360 mobile app,

00:44

I want to show some admin options.

00:46

And for that I'll jump on to my Chrome browser window.

00:50

As discussed in the introduction,

00:52

checklist management system is part of the Field Management

00:55

service.

00:56

So you need to activate the field management

00:58

service for you to be able to run checklists.

01:01

Once the service is activated, if I click on Field Management,

01:05

I can now quickly have a look at all the different roles

01:08

and the permissions assigned to those roles

01:09

when it comes to checklists templates and also checklists.

01:13

Also, for checklists to be effective,

01:16

it is really important that we have got locations

01:19

defined in the project.

01:20

So for example, if I am assigning a commissioning

01:23

checklist to someone, they need to know exactly the location

01:26

of the equipment on which they can run the checklist.

01:29

For that if I click on locations, on this project

01:33

I've got two towers, so tower one and tower two.

01:36

Both these have got roof HVAC locations

01:39

because that's where our equipment are on which we are

01:42

supposed to run the checklists.

01:44

Now that we understand this, let's

01:46

have a quick look at the Field Management service.

01:50

Right now, I'm in the checklists tab

01:52

and I can see that this user has got

01:54

a number of different checklists assigned.

01:56

If I go to the Templates tab, I can

01:58

see that these are the templates that we've got available.

02:01

There's a quality checklist, there's a safety checklist,

02:04

and there's also a commissioning checklist.

02:06

Because this user is logged in as an admin,

02:09

they can import checklists templates

02:11

or they can create new templates as well.

02:14

Going back to the checklist tab, I'm

02:17

going to go into this checklist here

02:19

and I'm going to schedule it to be run today.

02:22

And I'll pick today's date.

02:26

Now that we understand this, let's jump on to the BIM 360

02:29

mobile app and go through the process of running checklists

02:32

on site.

02:34

All right.

02:34

So on the BIM 360 mobile app, I'm

02:36

going to tap on Checklists on the bottom toolbar.

02:40

And I can now see that these are the two checklists that

02:42

were assigned to me that are supposed to be run today.

02:45

I can also see the location of the equipment on which I

02:47

need to run this checklist.

02:49

Because I'm currently in tower one,

02:52

so I'll start with the tower one checklist which

02:54

is the pre functional test.

02:56

I'll tap on the checklist.

02:58

Now this checklist has got two sections.

03:01

The first section is the pre functional test cooling

03:04

tower operation section, and the second section

03:07

is the signature section.

03:09

Let's start with running this checklist.

03:12

The first question is cooling tower starts and runs.

03:16

Once I have gone through the process of starting and running

03:18

the cooling tower, I can then decide whether it

03:21

passes this question or fails.

03:23

In this case, I'm going to go pass.

03:25

And if need be, I can tap on Photograph

03:27

and take a photo as well.

03:30

Second is fan rotation verified correct under normal operation.

03:34

I'll go pass.

03:36

Similarly in this case, I'm going

03:38

to run through all these items.

03:40

I'll make sure that I have performed those activities

03:42

on the equipment and I can then decide whether pass or fail.

03:47

In this case, this equipment passes pre functioning test.

03:51

In the comments I can either comment here.

03:53

And now in the signature section I can specify my name,

03:58

I can specify my company.

04:01

Now notice that as soon as I tap here to sign,

04:04

it says checklists sections are incomplete.

04:07

So what I need to do is I need to make sure I tap on Done

04:11

here once I've run through all the questions in this section.

04:14

And now it says all sections completed

04:16

I can sign this checklist.

04:18

I'll tap here.

04:20

And now I'll tap on Create.

04:22

It shows me on the top right that the checklist

04:24

is completed.

04:25

I can tap on it.

04:27

And now it has completed this checklist.

04:29

I can also see in the checklist panel

04:31

that it says 100% completed.

04:33

Similarly once I'm in tower two, I

04:36

can go to the second checklist.

04:38

In this case section one has got four questions.

04:42

I'm going to pass all of these.

04:46

I'll tap Done.

04:49

And now I can specify the details here as well.

04:54

And lastly, I can tap here to sign.

04:58

Now because this checklist is completed again,

05:00

I can tap on checklist completed.

05:03

And the status of this checklist in the checklist panel

05:06

is also set to completed.

05:08

So this is how we run checklists on site.

05:11

In the next course I'm going to talk

05:13

about what happens if there are nonconforming items that fail.

05:17

How we create issues using those items.

05:19

So I'll see you in the next course.

05:20

Cheers.

Running Checklists Onsite using the BIM 360 Mobile App – Practice Exercise

It is assumed that the admin tasks such as activating the Field Management service, adding locations, and creating and assigning the checklists are already completed. Refer to the Objective 2 video to know more.

Task 1: Reviewing the Checklists panel on the BIM 360 Mobile App
1. From the bottom toolbar on the BIM 360 mobile app, tap on Checklists; the Checklists panel is displayed with all the existing checklists that are associated with the current user, as shown in the following image:

2. Tap on any of the checklists that are not started; the checklist is opened, as shown in the following figure:

Task 2: Running the checklist
1. One by one, go through the questions in the checklist and tap on the compliant option (PASS or +).

2. Once you have completed all the tasks in the first section of the checklist, tap on DONE on the top right, as shown in the following figure: 

3. If the signature section is added to the checklist, tap on Show signature in the All sections completed window, as shown in the video. On doing so, you are taken to the Required signatures section of the checklist.

4. Enter the details in this section and then sign the checklist.

5. Tap Create on the top right to complete the signature section, as shown in the following figure:

6. On the top right, tap on Checklist Completed; the status of the checklist is set to COMPLETED in the Checklists panel, as shown in the following figure:

7. Similarly, run other assigned checklists.