In a BIM project, construction drawings are required to commence the fabrication process.

(Select one)
Select an answer

For the operations phase, document control and flow are more static and long-term than for the other phases.

(Select one)
Select an answer

The design phase is synonymous with the architectural/engineering (AE) phase.

(Select one)
Select an answer

In what phase does mobilization occur?

(Select one)
Select an answer

A typical BIM Project Implementation Framework is best described as what?

(Select one)
Select an answer

Which of the following is NOT an AECO project phase?

(Select one)
Select an answer

Generally, the BIM Project Lifecycle is well developed and mature, with little changes anticipated for the AECO phases.

(Select one)
Select an answer

Which of the following is NOT a typical information management system for facilities?

(Select one)
Select an answer

What type of analysis can be performed earlier in the design stage?

(Select one)
Select an answer