Use document revisions

00:05

in this video you'll learn how to create and manage sheet issues and revisions.

00:11

You'll also see how to create revision clouds

00:14

and control which revision they belong to.

00:25

To manage sheet issues and revisions switch to the view tab.

00:30

Then in the sheet composition panel click revisions.

00:35

This opens the sheet issues revisions dialogue.

00:40

You can add rows to this table

00:43

to create issues or revisions.

00:47

Revisions are typically tied to clouds and tags and issues are not

00:52

but you can use the functionality

00:55

to really do whatever you want and use the sheet issues and

00:59

revisions in a way that meets the needs of your project.

01:04

By default there is one row in the table

01:08

for each row

01:09

you can control the numbering.

01:12

The options are alpha numeric

01:14

numeric and none.

01:17

I'll select numeric

01:19

and also be aware that you can customize the numbering

01:24

in the customized numbering area,

01:26

click the numbering button to open a dialogue

01:30

where you can create a customized sequence.

01:34

For example in this exercise there are two

01:37

and if I select alpha numeric

01:39

I can then click edit numbering sequence

01:42

to open a dialogue where we can customize the sequence

01:47

and here you can see

01:49

the available options and you can create a new sequence and customize it as needed.

01:57

I'll click OK to close each of these dialogues

02:01

and then we'll continue on here with our

02:05

issue.

02:06

So the numbering is set to numeric and then you

02:09

can specify the date and give it a description.

02:14

For example

02:15

I'll enter

02:17

issued for construction

02:24

and then once the the revision or issue

02:28

has actually been issued you can select issued

02:31

but for now I'm going to leave that de selected

02:34

and then you can specify who it's issued to and who it's issued by.

02:39

And then in the show column you can choose cloud and tag, tag or none.

02:46

So I'm gonna select none for this example

02:49

and then I'm going to add another row

02:52

And I'm gonna leave the numbering the same and for the description,

02:57

I'm going to call it revision one

03:02

and then under show I'm gonna leave it set to cloud and tag

03:07

additionally be aware that you can control the numbering method.

03:13

And so right here we're this is the numbering sequence here in this column but to the

03:18

right there is a numbering method here and this

03:21

can either be per project or per sheet.

03:25

And so when we have it set to per project then we're going

03:29

to be using the revision number that appears here in this dialogue.

03:34

If we change it to per sheet then it's going to

03:37

be based on the revisions that appear on the sheet.

03:41

So there could be there maybe you have

03:51

Then those are going to be numbered based on

03:54

the order that they are placed on the sheet.

03:57

Alright,

03:58

You can also move revisions up and down. So after they are created

04:03

you can move them up, you can move them down,

04:06

you can even merge revisions,

04:08

you can merge it with the revision above or merge it with the revision below

04:13

depending on how many you have and what you have selected here

04:17

in the table.

04:19

I'm going to click OK

04:22

to close the dialog

04:24

and then I'm going to open the ground floor overall

04:27

view

04:28

and I'm simply going to place a revision cloud

04:32

and I can do that by switching to the annotate tab and in the detail panel

04:38

click revision cloud.

04:41

And with this tool active you can use any of the

04:45

options in the draw gallery to sketch a revision cloud.

04:50

So I'll simply leave rectangle selected and then before I create a revision cloud,

04:57

I always want to check the revision here in the properties palette,

05:01

this is the revision that the cloud is going to be assigned to.

05:06

So I'm gonna select revision one

05:09

and then I'm simply going to sketch a rectangle

05:12

and notice that as I sketch the rectangle.

05:14

The cloud is created in a rectangular method based on what I sketched.

05:22

And then I'll click finish edit mode

05:25

and I'm going to go ahead and tag that.

05:27

So I'm gonna activate the tag by category tool

05:30

and I'll deselect leader and then I will place

05:35

the revision cloud tag, then I'll click modify to end the command.

05:40

Now when I go back to the sheet that the view is placed on

05:45

and I zoom in

05:47

to the revision schedule in the title block, you can see that revision one appears

05:54

and you can see the cloud and tag where we placed it.

05:59

So when you place a revision cloud and it's assigned to

06:02

a revision then that revision will appear in the title block.

06:07

If you want additional issues to appear

06:11

then you can look in the properties palette

06:13

and scroll down to the bottom to the revisions on sheet parameter

06:18

and click edit.

06:20

And this opens the revisions on sheet dialog. And now we can select to show

06:27

the first issue that we created which is issued for construction and then click OK.

06:34

And now both of those appear in our revisions schedule.

06:40

So once again a lot of flexibility there with

06:42

how you choose to create sheet issues and revisions.

06:48

Let's go back to the sheet issues revisions dialogue

06:52

and then we're going to issue one of these

06:56

by simply clicking the checkbox in the issued column.

06:60

And when we do

07:01

be aware that all of the information becomes

07:05

dim and it's no longer available to be adjusted

07:10

also we can no longer merge the any revision we

07:15

have with a issue or revision that has been issued.

07:20

So as you can see here for sequence two,

07:23

we can no longer merge it with sequence one because that has been issued already.

07:28

So you need to be aware of that.

07:31

I'll click OK to close the dialog and once again to access the

07:36

dialogue to control which issues or revisions appear in the title block.

07:41

You need to look at the instance, properties for the sheet,

07:45

look for revisions on sheet and then click.

07:48

Edit.

07:49

And that's where you can control which revisions

07:53

or issues to show in your title block.

Video transcript

00:05

in this video you'll learn how to create and manage sheet issues and revisions.

00:11

You'll also see how to create revision clouds

00:14

and control which revision they belong to.

00:25

To manage sheet issues and revisions switch to the view tab.

00:30

Then in the sheet composition panel click revisions.

00:35

This opens the sheet issues revisions dialogue.

00:40

You can add rows to this table

00:43

to create issues or revisions.

00:47

Revisions are typically tied to clouds and tags and issues are not

00:52

but you can use the functionality

00:55

to really do whatever you want and use the sheet issues and

00:59

revisions in a way that meets the needs of your project.

01:04

By default there is one row in the table

01:08

for each row

01:09

you can control the numbering.

01:12

The options are alpha numeric

01:14

numeric and none.

01:17

I'll select numeric

01:19

and also be aware that you can customize the numbering

01:24

in the customized numbering area,

01:26

click the numbering button to open a dialogue

01:30

where you can create a customized sequence.

01:34

For example in this exercise there are two

01:37

and if I select alpha numeric

01:39

I can then click edit numbering sequence

01:42

to open a dialogue where we can customize the sequence

01:47

and here you can see

01:49

the available options and you can create a new sequence and customize it as needed.

01:57

I'll click OK to close each of these dialogues

02:01

and then we'll continue on here with our

02:05

issue.

02:06

So the numbering is set to numeric and then you

02:09

can specify the date and give it a description.

02:14

For example

02:15

I'll enter

02:17

issued for construction

02:24

and then once the the revision or issue

02:28

has actually been issued you can select issued

02:31

but for now I'm going to leave that de selected

02:34

and then you can specify who it's issued to and who it's issued by.

02:39

And then in the show column you can choose cloud and tag, tag or none.

02:46

So I'm gonna select none for this example

02:49

and then I'm going to add another row

02:52

And I'm gonna leave the numbering the same and for the description,

02:57

I'm going to call it revision one

03:02

and then under show I'm gonna leave it set to cloud and tag

03:07

additionally be aware that you can control the numbering method.

03:13

And so right here we're this is the numbering sequence here in this column but to the

03:18

right there is a numbering method here and this

03:21

can either be per project or per sheet.

03:25

And so when we have it set to per project then we're going

03:29

to be using the revision number that appears here in this dialogue.

03:34

If we change it to per sheet then it's going to

03:37

be based on the revisions that appear on the sheet.

03:41

So there could be there maybe you have

03:51

Then those are going to be numbered based on

03:54

the order that they are placed on the sheet.

03:57

Alright,

03:58

You can also move revisions up and down. So after they are created

04:03

you can move them up, you can move them down,

04:06

you can even merge revisions,

04:08

you can merge it with the revision above or merge it with the revision below

04:13

depending on how many you have and what you have selected here

04:17

in the table.

04:19

I'm going to click OK

04:22

to close the dialog

04:24

and then I'm going to open the ground floor overall

04:27

view

04:28

and I'm simply going to place a revision cloud

04:32

and I can do that by switching to the annotate tab and in the detail panel

04:38

click revision cloud.

04:41

And with this tool active you can use any of the

04:45

options in the draw gallery to sketch a revision cloud.

04:50

So I'll simply leave rectangle selected and then before I create a revision cloud,

04:57

I always want to check the revision here in the properties palette,

05:01

this is the revision that the cloud is going to be assigned to.

05:06

So I'm gonna select revision one

05:09

and then I'm simply going to sketch a rectangle

05:12

and notice that as I sketch the rectangle.

05:14

The cloud is created in a rectangular method based on what I sketched.

05:22

And then I'll click finish edit mode

05:25

and I'm going to go ahead and tag that.

05:27

So I'm gonna activate the tag by category tool

05:30

and I'll deselect leader and then I will place

05:35

the revision cloud tag, then I'll click modify to end the command.

05:40

Now when I go back to the sheet that the view is placed on

05:45

and I zoom in

05:47

to the revision schedule in the title block, you can see that revision one appears

05:54

and you can see the cloud and tag where we placed it.

05:59

So when you place a revision cloud and it's assigned to

06:02

a revision then that revision will appear in the title block.

06:07

If you want additional issues to appear

06:11

then you can look in the properties palette

06:13

and scroll down to the bottom to the revisions on sheet parameter

06:18

and click edit.

06:20

And this opens the revisions on sheet dialog. And now we can select to show

06:27

the first issue that we created which is issued for construction and then click OK.

06:34

And now both of those appear in our revisions schedule.

06:40

So once again a lot of flexibility there with

06:42

how you choose to create sheet issues and revisions.

06:48

Let's go back to the sheet issues revisions dialogue

06:52

and then we're going to issue one of these

06:56

by simply clicking the checkbox in the issued column.

06:60

And when we do

07:01

be aware that all of the information becomes

07:05

dim and it's no longer available to be adjusted

07:10

also we can no longer merge the any revision we

07:15

have with a issue or revision that has been issued.

07:20

So as you can see here for sequence two,

07:23

we can no longer merge it with sequence one because that has been issued already.

07:28

So you need to be aware of that.

07:31

I'll click OK to close the dialog and once again to access the

07:36

dialogue to control which issues or revisions appear in the title block.

07:41

You need to look at the instance, properties for the sheet,

07:45

look for revisions on sheet and then click.

07:48

Edit.

07:49

And that's where you can control which revisions

07:53

or issues to show in your title block.

Video quiz

Where is the Revisions on Sheet dialog accessed from?

(Select one)
Select an answer

1/1 questions left unanswered