Transcript
00:01
In this video, we will cover creating sheets with the correct title block.
00:06
Creating revisions and adding revision information to sheets.
00:12
In this project, we will create a sheet for the ground floor HVAC plan view.
00:19
To create a sheet, scroll down in the project browser to the Sheets branch and then right click and select New Sheet.
00:29
This opens the New Sheet dialog.
00:32
You can select the title block you want to use.
00:35
In this case, we will select the E1 30 x 42 title block and then click Ok.
00:43
This immediately creates the new sheet and Revit automatically names and numbers the sheet.
00:50
You can expand the Sheets branch in the Project Browser and then right click a sheet and select Rename.
00:58
For this example, I'll enter M101 for the number,
01:03
and then for the sheet name I'll enter Ground Floor HVAC and click Ok.
01:12
Take note that these are parameters in the title block family,
01:16
and you can update them in the drawing area as well by selecting the title block and then activating one of the parameters.
01:27
To place the view onto the sheet, you can drag and drop it from the Project Browser.
01:33
So for this example I'll select the Ground Floor HVAC Plan view and drag and drop it onto the sheet.
01:41
When I do, you can see the view port underneath the cursor and I can simply click to place the view port on the sheet.
01:53
When you place a view port Be aware that there are two things, there's the View Port and then there is the View Port Title.
02:02
If you select the View Port, you can then use your cursor to drag it and move it anywhere on the sheet.
02:12
Also there are dot controls on the View Title tag that you can use to adjust the length of this line.
02:22
If you want to move the view title, you have to deselect the View Port and then select the View Title.
02:29
And then you can move it independently of the View Port.
02:38
When you select the View Port, you can click Edit Type and view the type Properties.
02:44
You can create multiple types of view ports.
02:47
For example, you can see that the parameters here are Title, Show Title, Show Extension Line and then Line Weight Color and Line Pattern.
02:57
So you may at a minimum want to have a view port that shows the title,
03:01
and then another one that does not for maybe details or legends or other types of non floor plan and section views.
03:13
I'll click Ok to close this Type Properties dialog and then we will take a look at the revision schedule,
03:21
and so in a title block family, you can add a revision schedule and have it populate with revision information.
03:29
Now to add revisions to a project or sheet issue information, you can switch to the View ribbon,
03:37
and then in the Sheet Composition panel, click revisions and this will open the Sheet Issues/Revisions dialog.
03:48
This is where you can add sheet issue and revision information.
03:53
To begin there is a revision added by default and you can adjust the revision number.
04:03
Now, you cannot do so manually here but you can click one of the numbering options,
04:08
either numeric or alpha numeric and adjust how the sequence numbers.
04:15
So for example for numeric, you can adjust the starting number and then you can even add a prefix or a suffix,
04:22
and then alpha numeric, you can enter in characters for the sequence and then once again add a prefix and a suffix.
04:32
I'll click Ok to close this dialog,
04:35
and then next you can control the numbering methods to either numeric, alpha numeric or none if you don't want any numbering,
04:43
and then depending on which one you select, it will use either one of these options that have been specified.
04:50
Then you can enter a date, enter the revision description and then after the revision has been issued, you can select the Issued check box,
04:59
but notice that when you do this information will become greyed out and cannot be modified.
05:06
I will deselect Issued and then you can also enter Issued to and Issued by,
05:11
and then under Show You can choose whether you want to show the cloud and the tag.
05:16
Just the tag or neither one of those.
05:21
To add revisions, you can click the Add button and it'll add new revisions.
05:27
And then you can also control the numbering method in this dialogue.
05:31
The options are per project or per sheet.
05:34
If you select per project, then the revisions will be numbered in based on the revision number in this dialogue.
05:43
If it's per sheet, then they will be numbered based on the revisions that are placed on the sheet,
05:50
and not necessarily based on the total number of revisions in the project.
05:55
When you switch the numbering method, a dialog will appear, it's asking if you want to do that.
06:01
I'm going to click No and we'll leave it set to per project.
06:06
You can also move revisions, you can move them up or down and then if you want to remove a revision, you can either merge it.
06:16
I'll select a revision so you can merge it with the revision above or below it,
06:22
and then there's also a Delete button and you can just delete it altogether.
06:27
But a couple things to note here.
06:28
If a revision has been issued So if I click Issued and then I select one of those,
06:34
you'll notice that I cannot delete it and I cannot merge it with the revision above or below,
06:42
but I can select multiple revisions and then delete them if needed.
06:50
I'm going to leave these two and I'm going de-select Issued and then I'll click Ok,
06:56
and then in the Project Browser scroll down and you can see Revisions on Sheet parameter and I will click Edit,
07:05
and this opens the Revisions on Sheet dialog and here you can choose whether or not to show each of these revisions on the title block.
07:15
And so if you add a revision tag that appears on the sheet then that information will be added.
07:24
And then you can use this dialog to add additional revisions to the title block.
07:30
So if I select both of these, if I select that they are shown and click Ok,
07:35
then they will appear in the title block even though there's not a cloud associated to that revision placed on this sheet.
00:01
In this video, we will cover creating sheets with the correct title block.
00:06
Creating revisions and adding revision information to sheets.
00:12
In this project, we will create a sheet for the ground floor HVAC plan view.
00:19
To create a sheet, scroll down in the project browser to the Sheets branch and then right click and select New Sheet.
00:29
This opens the New Sheet dialog.
00:32
You can select the title block you want to use.
00:35
In this case, we will select the E1 30 x 42 title block and then click Ok.
00:43
This immediately creates the new sheet and Revit automatically names and numbers the sheet.
00:50
You can expand the Sheets branch in the Project Browser and then right click a sheet and select Rename.
00:58
For this example, I'll enter M101 for the number,
01:03
and then for the sheet name I'll enter Ground Floor HVAC and click Ok.
01:12
Take note that these are parameters in the title block family,
01:16
and you can update them in the drawing area as well by selecting the title block and then activating one of the parameters.
01:27
To place the view onto the sheet, you can drag and drop it from the Project Browser.
01:33
So for this example I'll select the Ground Floor HVAC Plan view and drag and drop it onto the sheet.
01:41
When I do, you can see the view port underneath the cursor and I can simply click to place the view port on the sheet.
01:53
When you place a view port Be aware that there are two things, there's the View Port and then there is the View Port Title.
02:02
If you select the View Port, you can then use your cursor to drag it and move it anywhere on the sheet.
02:12
Also there are dot controls on the View Title tag that you can use to adjust the length of this line.
02:22
If you want to move the view title, you have to deselect the View Port and then select the View Title.
02:29
And then you can move it independently of the View Port.
02:38
When you select the View Port, you can click Edit Type and view the type Properties.
02:44
You can create multiple types of view ports.
02:47
For example, you can see that the parameters here are Title, Show Title, Show Extension Line and then Line Weight Color and Line Pattern.
02:57
So you may at a minimum want to have a view port that shows the title,
03:01
and then another one that does not for maybe details or legends or other types of non floor plan and section views.
03:13
I'll click Ok to close this Type Properties dialog and then we will take a look at the revision schedule,
03:21
and so in a title block family, you can add a revision schedule and have it populate with revision information.
03:29
Now to add revisions to a project or sheet issue information, you can switch to the View ribbon,
03:37
and then in the Sheet Composition panel, click revisions and this will open the Sheet Issues/Revisions dialog.
03:48
This is where you can add sheet issue and revision information.
03:53
To begin there is a revision added by default and you can adjust the revision number.
04:03
Now, you cannot do so manually here but you can click one of the numbering options,
04:08
either numeric or alpha numeric and adjust how the sequence numbers.
04:15
So for example for numeric, you can adjust the starting number and then you can even add a prefix or a suffix,
04:22
and then alpha numeric, you can enter in characters for the sequence and then once again add a prefix and a suffix.
04:32
I'll click Ok to close this dialog,
04:35
and then next you can control the numbering methods to either numeric, alpha numeric or none if you don't want any numbering,
04:43
and then depending on which one you select, it will use either one of these options that have been specified.
04:50
Then you can enter a date, enter the revision description and then after the revision has been issued, you can select the Issued check box,
04:59
but notice that when you do this information will become greyed out and cannot be modified.
05:06
I will deselect Issued and then you can also enter Issued to and Issued by,
05:11
and then under Show You can choose whether you want to show the cloud and the tag.
05:16
Just the tag or neither one of those.
05:21
To add revisions, you can click the Add button and it'll add new revisions.
05:27
And then you can also control the numbering method in this dialogue.
05:31
The options are per project or per sheet.
05:34
If you select per project, then the revisions will be numbered in based on the revision number in this dialogue.
05:43
If it's per sheet, then they will be numbered based on the revisions that are placed on the sheet,
05:50
and not necessarily based on the total number of revisions in the project.
05:55
When you switch the numbering method, a dialog will appear, it's asking if you want to do that.
06:01
I'm going to click No and we'll leave it set to per project.
06:06
You can also move revisions, you can move them up or down and then if you want to remove a revision, you can either merge it.
06:16
I'll select a revision so you can merge it with the revision above or below it,
06:22
and then there's also a Delete button and you can just delete it altogether.
06:27
But a couple things to note here.
06:28
If a revision has been issued So if I click Issued and then I select one of those,
06:34
you'll notice that I cannot delete it and I cannot merge it with the revision above or below,
06:42
but I can select multiple revisions and then delete them if needed.
06:50
I'm going to leave these two and I'm going de-select Issued and then I'll click Ok,
06:56
and then in the Project Browser scroll down and you can see Revisions on Sheet parameter and I will click Edit,
07:05
and this opens the Revisions on Sheet dialog and here you can choose whether or not to show each of these revisions on the title block.
07:15
And so if you add a revision tag that appears on the sheet then that information will be added.
07:24
And then you can use this dialog to add additional revisions to the title block.
07:30
So if I select both of these, if I select that they are shown and click Ok,
07:35
then they will appear in the title block even though there's not a cloud associated to that revision placed on this sheet.
Step-by-step guide