Test hydrants in a network for fire flow compliance.
Tutorial resources
These downloadable resources will be used to complete this tutorial:
InfoWorks WS Pro allows a selection of hydrants to be tested against preset criteria. A Fire flow group and a version-controlled Fire flow object are both required to store the hydrant parameters and testing constraints. This is a way of testing hydrants to ensure they can maintain both flow and pressure during fire emergencies.
After performing a fire flow run:
Based on the values you entered, you will test one hydrant to see if it can provide between 5 and 20 liters per second in the event of a fire at a nearby building. You will also test if the hydrant itself can maintain a minimum residual pressure of 15 meters, and if the immediate demand zone around the hydrant and entire network can maintain at least 10 meters of pressure.
A grid opens, showing how each hydrant performed in the simulation.
In the Hydrant Testing Result column, some of the hydrants have passed the set criteria and some have not. This indicates that if the set criteria were used to judge the compliance of the network to provide the required fire flow under the specified conditions, the hydrants that have failed would not be deemed complaint.